Skip to the news
Monday, August 10, 2026 · Vancouver, B.C.
The Pacific Post
Business & Markets

Port of Vancouver clears its grain backlog after a three-week rail repair

Twenty-nine vessels were waiting at anchor at the peak. The last of them loads this week.

The grain terminal at first light, backlog clearing.
The grain terminal at first light, backlog clearing. Illustration for the Post

The lineup of grain vessels that has defined English Bay's horizon since mid-July is dissolving. The port authority confirmed Monday that the last of the twenty-nine ships waiting at the peak of the backlog will load this week, closing out the disruption that began with a washout on the North Shore rail cut.

The three-week repair was, by railway standards, fast. The backlog it created was not small: at anchor rates of roughly $25,000 a day per vessel, the delay bill lands somewhere north of $12 million, most of it ultimately netted out of the prices paid to prairie growers — the invisible export tax that every interruption on this corridor levies a thousand kilometres inland.

The episode has given fresh momentum to the terminal operators' longest-running ask: redundancy on the North Shore cut, where a single track pinched between cliff and tide carries a measurable share of the country's exports. The railway's position is that redundancy exists — via a second crossing and a longer route — which the terminals translate as "via Kamloops."

The bay, for its part, returns to its usual population of bulkers this week. The regulars who walk the seawall and count ships — a larger constituency than either the port or the railway suspects — will notice.

Share the story Facebook X Bluesky LinkedIn Email